Purple Painting partnered with Pac-West Construction to provide the complete painting package for the new DMV headquarters on Santa Maria Way, Santa Maria, a full ground-up build. The work covered interior offices and service counters, exterior finishes and protective coatings.

Type
Public Sector
Location
Santa Maria Way
Client
Pac-West Construction
Completed
2025

When the City of Santa Maria set out to build a new DMV headquarters, they needed a facility that would be both functional and welcoming to the thousands of residents who pass through its doors every year.

Purple Painting was proud to partner with Pac-West Construction to provide the complete painting package for this full ground-up build. From interior offices and service counters to exterior finishes and protective coatings, our crew handled every surface with the attention to detail this high-profile public project demanded.

We coordinated closely with the general contractor to ensure that timelines were met and that every finish aligned with the strict standards of a state facility. Our work not only enhanced the building’s durability but also helped create a professional, approachable space for the community.

This project reflects the core of what we do best: bringing large-scale projects to life with craftsmanship, reliability, and pride.

How we did it

  1. Paint the interior walls and ceilings

    The new gypsum board walls and ceilings were painted throughout the building.

    Service counters and rows of waiting-area chairs in the main hall — Santa Maria DMV
  2. Paint doors, frames and handrails

    Interior doors and frames, the handrail at the ramp and the ladder base were painted.

    Corridor alcove with drinking fountains and fire extinguisher cabinet — Santa Maria DMV
  3. Prime the canopy steel

    The steel structure of the drive-through and employee patio canopies, including the HSS columns and wide-flange beams, was primed through a change order.

  4. Paint the exterior metal

    The metal trim cornice, trash enclosure metal decking and steel, and the steel canopy framing were painted.

  5. Finish the added items

    Change orders added the eggcrate ceiling, the drive-through canopy ceiling, the staff entry canopy, and the gas pipes and bollards.