We are partnering with Unispace for painting at the Sonos new headquarters in Goleta. This project includes all new offices and doors along with some repainting in the existing offices. This is a fast-paced build out with a strict deadline to adhere.

How we did it

  1. Prime the new drywall

    The new drywall walls were primed before the tile and acoustic panels went in.

  2. Paint new walls and ceilings

    The new gypsum board walls and ceilings were painted in the new offices.

    Product Sherwin-Williams ProMar 200, eggshell on walls, flat on ceilings

  3. Paint the listening rooms

    The listening rooms got their own darker colour on the walls.

    Product Sherwin-Williams SuperPaint, satin

  4. Paint the new doors and frames

    The new hollow metal doors and frames were painted in a semi-gloss industrial acrylic, along with the paint-grade wood doors.

  5. Convert the accent walls to white

    Accent walls on both floors were primed and given two coats to turn them white, and gray ceilings in several rooms were repainted white. Scaffolding was set up at the staircases to reach the tall walls.

  6. Prime exposed copper and conduit