Lompoc Theatre Seismic Retrofit Painting, Lompoc

Schipper Construction · Lompoc

Lompoc Theatre facade and marquee from the sidewalk — Lompoc Theatre Seismic Retrofit Painting, Lompoc

Purple Painting painted the new work on the Lompoc Theatre's seismic retrofit and roof replacement for Schipper Construction: the metal parapet coping, the steel plates at the top of the parapet walls, the downspouts and leader boxes, and the rebuilt stucco chimney.

Type
Commercial
Location
Lompoc, CA
Client
Schipper Construction, General Contractor
Completed
2026

Purple Painting was the painting subcontractor to Schipper Construction on phase 1 of the Lompoc Theatre's seismic upgrades and roof replacement, in downtown Lompoc.

We painted the new metal parapet coping, including a stretch of coping added during the job, and the new 6-by-6-inch steel plates at the top of the parapet walls of the barrel roof theatre and the stage tower. Six downspouts got two coats and the six leader boxes were painted. The rooftop chimney, demolished and rebuilt in new stucco, was primed and given two coats in the colour provided.

How we did it

  1. Paint the parapet coping

    The new metal coping along the parapets was painted, including a stretch of coping added during the job.

  2. Paint the steel plates

    The new 6-by-6-inch steel plates at the top of the parapet walls of the barrel roof theatre and the stage tower were painted.

  3. Paint the downspouts and leader boxes

    Six downspouts got two coats, and the six leader boxes were painted.

  4. Prime and paint the chimney

    The rooftop chimney, demolished and rebuilt in new stucco, was primed and given two coats in the colour provided.