Goleta Valley Cottage Hospital Renovation, Goleta
Cottage Health · Goleta
Purple Painting painted Stages A and B of the Goleta Valley Cottage Hospital renovation in Goleta for the general contractor ProWest Constructors: walls, ceilings, doors, frames and steel on two floors of a working hospital, then a close-out of every crash rail, wall guard and metal baseboard.
- Type
- Institutional
- Location
- Goleta, CA
- Client
- ProWest Constructors, General Contractor
- Owner
- Cottage Health
- Completed
- 2026
- Pure White
- Pure White
- Pure White
SW 7005
Sherwin-Williams Pro Industrial Waterbased Alkyd Urethane Enamel
semi-gloss · doors, door frames and window frames
- Pure White
SW 7005
Sherwin-Williams Pro Industrial Pre-Catalyzed Waterbased Epoxy
semi-gloss · wet-area walls and ceilings
- Silver Skate
- Oceana Drive
- Raccoon Fur
A two-stage renovation at Goleta Valley Cottage Hospital, painted for the general contractor ProWest Constructors. The hospital stayed in operation, so our crew worked in phases and move-ons across Level 1 and Level 2, around the flooring contractor and the hospital's live operations, under its infection-control and life-safety policies. The patient rooms got accent walls against the white, and their ceilings were painted.
The scope covered the gypsum board walls and ceilings, new and existing hollow metal doors, frames and window frames, exposed steel columns and the temporary walls, with epoxy where specified and a caulk line where each new frame meets its wall. On Level 2 we worked through the patient wing's corridors, patient rooms, therapy rooms, offices and closets, and touched up the columns, walls and existing steel beams of the outdoor patio. On Level 1 the work included the exterior of the wound care entry.
We finished with a clean close-out: every crash rail, wall guard, metal baseboard and bed stopper caulked, ceilings touched up, and two-coat touch-up finals in the corridors. The exterior got masking and primer.
How we did it
-
Phase the work around the hospital
The crew worked in phased sections and move-ons around the flooring contractor and live hospital operations.
-
Prime and paint walls and ceilings
The gypsum board walls and ceilings were primed and given two coats, with accent walls against the white in the patient rooms.
-
Prime and paint doors and frames
Door slabs and hollow metal frames were primed and given two coats.
-
Coat the metal canopy and plaster
The steel tube canopy got a high-performance coating, and the plaster columns and walls at the canopy and vestibule got two coats.
-
Caulk rails, guards and baseboards
Crash rails, wall guards, metal baseboards and bed stoppers were caulked where they meet the painted wall.
-
Touch up the corridors
Ceilings and corridors got two-coat touch-up finals, with every crash rail touched up.