Wallcovering, SBCC Cosmetology, Santa Barbara

Smith MEP · Downtown Santa Barbara

Long classroom wall hung with a purple and gray digital wallcovering under a white open ceiling, nearly finished — Wallcovering, SBCC Cosmetology, Santa Barbara

Purple Painting is hanging two wallcoverings at the new Santa Barbara City College cosmetology school in downtown Santa Barbara for Smith MEP: a wall protection wallcovering and a digital wallcovering. The walls were primed and painted first.

Type
Wallcovering
Location
Anacapa Street, Santa Barbara, CA
Client
Smith MEP, General Contractor

Purple Painting is the painting subcontractor to Smith MEP on the tenant improvement that turns a downtown Santa Barbara building into Santa Barbara City College’s new cosmetology school, and we are also hanging its wallcovering. It is a public works project.

There are two wallcovering applications on the third floor. One is Momentum P3TEC Stellar in Neutral Flake, a wall protection wallcovering made to stand up to impact, cleaning chemicals and abrasion. The other is Maharam Generator 001, a digital wallcovering. Both were added to the contract by change order, with the manufacturer-specified primers and adhesives.

This job is still in progress. The first photo shows the digital wallcovering hung along a classroom wall, and the video shows the wall protection wallcovering on the lower part of a classroom wall. The other photos show the primed and painted walls the wallcovering is hung on. The page will be updated with the finished walls.

How we did it

  1. Prime and paint the walls

    The third-floor walls that take wallcovering were primed and painted before the wallcovering arrived, because it cannot go up until the painting behind it is done.

    Classroom with newly primed walls before the finish coats, work in progress — SBCC Cosmetology School Tenant Improvement, Santa Barbara
  2. Prime for the wallcovering

    The wallcovering manufacturer’s installation guide calls for the walls to be primed with its specified pigmented primer first, and the first wallcovering wall was primed on a time-and-materials basis.

  3. Hang the wall protection wallcovering

    The wall protection wallcovering is hung with the manufacturer’s specified adhesive, reverse hung, with the seams overlapped and double-cut.

  4. Hang the digital wallcovering

    The digital wallcovering goes up on its own wall, with the manufacturer’s specified primer and adhesive.